Industries·Automotive and parts
Zero defects, zero repeats.
8D, control plans and layered process audits kept connected across lines and plants.
- Frameworks
- IATF 16949, ISO 9001, WCM · TPM · Lean
- Teams
- Quality, Continuous improvement, Operations
Plant 5seal failureSame risk6 plantsFixed at9 plantsWhere the paperwork piles up
Four places it piles up in automotive and parts.
01
8Ds that take weeks to close
02
Control plans that drift from the line
03
Customer-specific requirements across programmes
04
The same defect at a sister plant
One event, handled
From the first signal to the last approval.
A customer reports a torque defect.
The 8D starts with the history of similar defects and the control plan.
The error-proofing fix reaches every line that runs the same part.
−52%All the evidence
defects with digital instructions instead of paper
Source · Letmathe & Rößler, Journal of Operations Management, 2022For your teams
Built around the people who run the plant.
See it run on a case from automotive and parts.Book 30 minutes →
Watch your management system run itself.
In 30 minutes we run SmartHow on a real case from your industry: an incident report writes itself, a procedure fixes itself, a lesson reaches every plant. You only approve.
- A real example from your industry, not a slideshow
- 30 minutes with an industrial engineer
- Leave knowing where it saves your plants the most hours