Industries·Metals and mining
Critical controls on every shift.
Fatal-risk controls, energy isolation and contractor safety kept verified, and every lesson carried to every site.
- Frameworks
- ISO 45001, ISO 14001, WCM · TPM · Lean
- Teams
- EHS, Maintenance, Plant leadership
Plant 5seal failureSame risk6 plantsFixed at9 plantsWhere the paperwork piles up
Four places it piles up in metals and mining.
01
Critical controls that must be verified every shift
02
Contractors who rotate between sites
03
Maintenance work under energy isolation
04
The same failure on the same equipment at another site
One event, handled
From the first signal to the last approval.
A critical control is found bypassed during energy isolation.
The event is drafted and linked to the fatal-risk standard.
Every site with the same equipment gets the lesson and confirms it.
−42%All the evidence
injuries after participatory safety training, in a randomized trial
Source · Randomized trial, 2017 · PMID 28052163For your teams
Built around the people who run the plant.
See it run on a case from metals and mining.Book 30 minutes →
Watch your management system run itself.
In 30 minutes we run SmartHow on a real case from your industry: an incident report writes itself, a procedure fixes itself, a lesson reaches every plant. You only approve.
- A real example from your industry, not a slideshow
- 30 minutes with an industrial engineer
- Leave knowing where it saves your plants the most hours